Static GNSS survey control establishment with ±3–5mm horizontal accuracy. 20+ projects delivered. 5-city simultaneous deployment proven at NEOM.
Every major project starts with control. We establish certified geodetic networks that anchor all surveys, drones, and construction staking. Sub-centimeter accuracy with NEOM-compliant documentation.
Multi-hour static observations processed with Leica Infinity or Trimble Business Center. ±3–5mm horizontal, ±5–10mm vertical accuracy.
Certified GCP establishment for drone photogrammetry and aerial surveys. Monumented and documented for future reference.
Strategic control point placement supporting multiple projects and contractors. Network expansion and infill surveys on demand.
Repeat baseline measurements for monitoring crustal movement, tidal effects, or settlement over time.
Tidal correction and geoid transformation for waterfront and maritime projects. Compliant with global GNSS standards.
Coordinate certificates, adjustment reports, and metadata compliance with NEOM spatial reference standards.
Horizontal: ±3–5mm + 2ppm baseline length
Vertical: ±5–10mm + 2ppm baseline length
Observation Duration: 2–4 hours per baseline (varies)
Initialization: Automatic from dual-frequency dual-constellation signals
Baseline Range: 5–200+ km (terrestrial)
Network Size: 10–100+ control points per project
Reference Frame: WGS84 (G1900) or client-specified
Deployment Time: 3–7 days for typical 50-point network
Unified geodetic network spanning Riyadh, Jeddah, Dammam, Mecca, and Medina. 100+ coordinated control points supporting Digital Twin program across five major cities simultaneously.
Unified control network for 5+ Tier-1 contractors (Al Jaber, El Seif, FMSCO, Hassan Allam, TDP) building floating industrial city. Tidal compensation and constraint network adjustment.
Control network densification for Trojena ski resort contractors (Al Tamimi, BATCO Tamimi). High-altitude GCP establishment at 2,000m+ elevation.
Control network with quarterly re-measurement campaigns. Deformation monitoring and settlement tracking for massive urban development site.
Tidal-corrected benchmarks for waterfront construction. Mean Sea Level (MSL) geoid transformations and tidal prediction support.
Official coordinate listing for all control points with accuracy estimates and metadata.
Least-squares adjustment with variance-covariance matrix and quality metrics.
GIS-ready control network diagram with monument locations and baseline lengths.
Monument documentation with photos, recovery instructions, and historical notes.
Complete baseline measurement data: distances, azimuths, and coordinate residuals.
Ellipsoidal to orthometric height conversion with geoid surface documentation.
Get a quote within 24 hours. We establish certified control networks in 3–7 days, anywhere in Saudi Arabia.