Structural deformation tracking, settlement surveys, and weekly construction monitoring with mobile mapping and precision measurement.
Construction doesn't stand still. Weekly or monthly monitoring campaigns capture progress, identify risks, and provide early warning of structural or settlement issues before they become problems.
Precision GNSS and total station measurement of structural displacement. Detect millimeter-level movements in real-time or post-analysis.
Monitor ground subsidence and foundation settlement over time. Benchmark leveling and differential GNSS for vertical accuracy.
High-resolution aerial and terrestrial imagery documenting construction phases. Geolocation and timestamp for progress tracking.
Vehicle-mounted LiDAR for large-area rapid capture. 200+ km/day coverage for monthly or quarterly progress updates.
Multi-epoch data comparison, statistical analysis, and trend visualization. Early warning alerts for out-of-spec movement.
24–48 hour turnaround on monitoring reports. Executive summary, detailed analysis, and recommendations for corrective action.
Horizontal: ±5–10mm per epoch
Vertical: ±10–20mm per epoch
Relative Precision: ±2–5mm (repeat-to-repeat)
Trending Sensitivity: Can detect 5mm/month subsidence
Executive Summary: Key findings, alerts, recommendations
Detailed Analysis: Point-by-point movement, graphs, tables
Visual Documentation: Before/after imagery, progress maps
Trend Forecast: Projected movement if trends continue
Continuous weekly monitoring campaigns capturing deformation and progress across the world's largest downtown development. 200+ km of corridors surveyed weekly with mobile mapping. Real-time alerts on structural movement.
Multi-phase earthwork monitoring and project management support. Settlement tracking and earthwork volume documentation. Monthly campaign reports with progress tracking.
Weekly/monthly baseline surveys for multi-phase construction projects. Compliance verification and as-built documentation. Rapid turnaround reporting for stakeholder communication.
We monitor for significant deviations and provide early warning of potential issues.
Movement within ±5mm between surveys. Trend analysis continues. Routine reporting.
Movement ±5–15mm detected. Increased monitoring frequency recommended. Management notification required.
Movement >15mm or accelerating trend. Immediate engineering review recommended. Corrective action planning initiated.
Hazardous movement >30mm or structural risk. Emergency engineering consultation and potential work stoppage.
Executive summary with key findings, graphs, and recommendations for each campaign.
Multi-epoch comparison showing cumulative movement, rates, and trend forecasts.
Georeferenced photos and orthomosaics documenting construction phase and current status.
GIS-ready vector and raster maps showing point movements, displacement vectors, and alerts.
Survey observations, coordinate listings, and observation files for archival and reanalysis.
Real-time SMS/email alerts if movement exceeds threshold. Escalation protocol to project management.
Get a quote within 24 hours. We deploy monitoring networks in 3–7 days with weekly reporting included.